FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION
OFFICE OF
ADMINISTRATIVE LAW JUDGES
1331 PENNSYLVANIA AVE., N.W., SUITE 520N
WASHINGTON, DC 20004-1710
TELEPHONE: 202-434-9900 / FAX: 202-434-9949
July 5, 2019
SECRETARY OF LABOR, MINE SAFETY AND HEALTH ADMINISTRATION (MSHA), Petitioner,
v.
PEABODY MIDWEST MINING, LLC, Respondent. |
|
|
CIVIL PENALTY PROCEEDINGS
Docket No. LAKE 2017-0073 A.C. No. 11-03156-423356
Docket No. LAKE 2017-0074 A.C. No. 11-03156-423356
Mine: Wildcat Hills Mine - Underground |
DECISION AND ORDER
Appearances: R. Jason Patterson, Esq., U.S. Department of Labor, Office of the Solicitor, Chicago, Illinois, for Petitioner;
Arthur M. Wolfson, Esq., Fisher & Phillips LLP, Pittsburgh, Pennsylvania, for Respondent.
Before: Judge L. Zane Gill
These cases originally comprised four section 104(a) citations issued at Peabody Midwest Mining, LLC’s Wildcat Hills Mine-Underground. Citation No. 9038387 was resolved by settlement prior to hearing.[1] The remaining three citations, Nos. 9039355, 9039356, and 9039357, were tried at a hearing in Marion, Illinois.
Citation Nos. 9039355, 9039356, and 9039357 were issued on September 8, 2016, for an area then known as the “old 2B panel.”[2] (Tr.39:8–14; 43:19–21) Each alleges a violation of an escapeway-related requirement: Citation No. 9039355 alleges that the area lacked post-accident communication and tracking; Citation No. 9039356 alleges that a lifeline was not provided; and Citation No. 9039357 alleges that a refuge alternative lacked communication. (Ex. S–2) It is Peabody’s position that these measures were not required because, at the relevant times, escapeways were not required in the old 2B panel. The Secretary asserts that escapeways were required. Therefore, the three citations involve a common foundational issue: whether escapeways were required in the old 2B panel in September 2016.
The dispute hinges on the determination of what the terms “removed” and “area” mean in the context of 30 C.F.R. § 75.380. Section 75.380(b)(1) requires that escapeways be “provided from each working section, and each area where mechanized mining equipment is being installed or removed, continuous to the surface escape drift opening [. . .] .” 30 C.F.R. § 75.380(b)(1) (emphasis added). Section 75.380(b)(2) specifies that “[d]uring equipment removal, [escapeways] shall begin at the location of the last loading point.” 30 C.F.R. § 75.380(b)(2).
Production at the old 2B panel stopped on August 26, 2016. (Tr.172:8–173:14; Ex. R–7 at 2) An air change and other items related to moving the production unit, including moving needed mechanized mining equipment, commenced on August 27, 2016. (Tr.124:15–125:1) Three pieces of equipment that were planned to eventually be transported from the mine were moved outby the last loading point and stored in nearby crosscuts. (Tr.99:3–7; 147:6–10; 148:4–6) Production was started at a new production unit on September 1–2, 2016. (Tr.174:13–175:4; Ex. R–7 at 8–9) The Secretary does not claim that active mining was being done in the old 2B panel when Inspector Brittan Belford was conducting his E01 inspection on September 6–8, 2016. (Tr.43:22–44:4)
The Secretary argues that escapeways were still required because the mechanized mining equipment had not been “removed” from the old 2b panel, which he argues is the relevant area in the regulation. Peabody argues that their mechanized mining equipment was “removed” because it had been moved outby the last loading point, which it sees as the relevant area in the regulation. If it was “removed,” as they argue, there was no requirement to maintain escapeways, and the three citations must be vacated since they all derive from the assumption that escapeways were required.
I. DECISION SUMMARY
In summary, I find that the essential removal process, which changed the requirements for maintaining escapeways, had been completed by the time Inspector Belford arrived. The Secretary’s interpretation of section 75.380(b), that mechanized mining equipment needed to be moved off the old 2b panel before escapeways could be discontinued, is not supported by the regulatory language, history, or logic. Thus, the fact that surplus equipment was stored outby the last loading point after being removed from an active face did not require Peabody to maintain escapeways. Consistent with Respondent’s position, once a formerly active production area is shut down and the equipment is moved outby the last loading point, the need to maintain escapeways is obviated. I conclude Citation Nos. 9039355, 9039356, and 9039357 must be vacated.
II. STIPULATIONS
1. Peabody Midwest Mining, LLC is an “operator” as defined in 3(d) of the Federal Mine Safety and Health Act of 1977, as amended (Mine Act), 30 U.S.C. 803(d) at the time the citations at issue in this proceeding were issued.
2. Peabody Midwest Mining, LLC operates Wildcat Hills Mine.
3. Wildcat Hills Mine is subject to the jurisdiction of the Federal Mine Safety and Health Act of 1977.
4. This proceeding is subject to the jurisdiction of the Federal Mine Safety and Health Review Commission and its designated Administrative Law Judges pursuant to sections 105 and 113 of the Mine Act.
5. The individual whose signature appears in Block 22 of the Citations at issue in this proceeding was acting in his official capacity and as an authorized representative of the Secretary of Labor when the citations were issued.
6. A duly authorized representative of the Secretary served the citations and terminations of the citations upon the agent of the Respondent at the date and place stated therein as required by the Mine Act, and the citations and terminations may be admitted into evidence to establish their issuance.
7. The total proposed penalty for the citations at issue will not affect Respondent’s ability to continue in business.
8. The citations contained in Exhibit A attached to the Petition for Assessment of Penalty are an authentic copy of the citations at issue in this proceeding with all appropriate modifications and terminations, if any.
9.
The exhibits to be offered by the Secretary and Peabody are stipulated to be
authentic, but no stipulation is made as to the relevance of the truth of the
matters asserted therein.
III. FACT SUMMARY[3]
A. The Unit 2 Move and Air Change (July–August 2016)
Wildcat Hills Mine has three active production units.[4] (Tr.99:8–10;
112:1–4; 200:20–23) In late August 2016, coal production on the “2B panel”
reached the geographic limit of the mining claim and had to stop, necessitating
a production unit move several miles away in the same mine. (Tr.112:5–113:1;
170:14–171:3)
When a production unit moves, either because mining has reached the
permitted geographic limit or a section has run out of coal or it has become
unprofitable, the shut-down process generally includes an “air change.” (Tr.168:3–6;
270:16–271:3) An air change is done to maximize fresh air flow to the new
active production area. (Tr.110:23–111:12; 271:5–9) More airflow is needed in
active production areas to dilute gases and dust, etc., (Tr.111:13–17), while
mined-out portions of a mine can be ventilated with return air.[5] (Tr.271:5–7)
After an air change, the escapeways that were required when the unit was in production are no longer required. (Tr.168:22–169:3) Any time mining equipment is moved for any reason from one place to another, it is moved in entries ventilated by belt air, not in a primary escapeway.[6] (Tr.268:18–269:12) MSHA has never indicated that it is out of compliance to do so (Tr.269:13–23), and this is the standard practice in District 8. (Tr.269:24–270:4) A plan to transport equipment from place-to-place in an entry ventilated by belt air has never been required. (Tr.270:5–9)
Prior to the air change, the intake air course and the 2B travelway were the primary and secondary escapeways, respectively. (Tr.94:7–20) They were required to be separate and could not have air in common. (Tr.94:21–95:3) The maps submitted with the air change plan showed that the entries that had been separate escapeways when unit 2 was operational would be made common on the 7 main north. (Tr.121:15–24; Ex. R–2)
1. Ventilation Plan
Peabody had to redirect ventilation air flow once production stopped on the 2B panel to send more and fresher air to other parts of the mine (Tr.111:5–17) and leave the current (but soon to be “old”) 2B panel in a worked-out status.[7] (Tr.275:10–276:7) In this case, the air change was substantial and complex enough to require a plan approved by MSHA. (Tr.109:17–110:3; 113:2–13) Matthew Kimbel[8] and his team modeled the ventilation capacity of the mine and determined how the ventilation controls needed to be arranged. (Tr.110:10–22; 114:10–17) The air change plan was based on the decision to move the production unit (i.e., unit 2) to the “Second East Mains.” (Tr.115:3–5; Ex. R–1 at 1) The plan proposal was submitted to MSHA on July 12, 2016. (Tr.116:5–7; Ex. R–1 at 1) MSHA did not approve this submittal. (Tr.117:18–20)
After receiving feedback from the MSHA district office, Peabody realized it had unneeded equipment (a spare belt drive) and decided to change the location of unit 2’s future faces from the “Second East Mains” to the “Second East Main Parallel” (new unit 2). (Tr.117:22–118:2; Ex. R–1 at 3–4) On July 29, 2016, Peabody submitted a superseding air change plan to MSHA along with three new revised maps, which identified the then-current ventilation controls and what ventilation control changes would be made. (Tr.115:6–14; 117:22–25; 118:3–119:11) The amended air change was planned for a single work shift, during which the escapeways would be maintained. (Tr.120:19–121:10; 124:15–23) MSHA approved this plan on August 17, 2016. (Tr.119:24–120:1; 121:9–10; Ex. R–1 at 5)
2. Equipment Plan
Stephen Reynolds[9] and Kimbel participated in making the decision as to where the equipment on the 2B panel would be moved. (Tr.129:1–3; 183:17–21) At Wildcat Hills, mechanized mining equipment is prepared for transport before an air change occurs. (Tr.271:10–272:7) First, all equipment is moved outby the loading point before the air change. (Tr.184:8–15) Next, subsequent decisions are made about what to do with each piece of equipment, with priority given to equipment needed for production at the new unit. (Tr.184:16–185:7) However, all of the mining equipment is not always moved to the new area when the production unit moves. (Tr.168:12–21) At Wildcat Hills, equipment is on a contractual tonnage-based maintenance schedule (Tr.278:4–10); thus, when a piece of equipment reaches its tonnage limit, it has to be transported out of the mine to be refurbished. (Tr.277:25–278:17) Continuous miners are taken out of the mine for these repairs once every two or three section changes, with rebuilt continuous miners taking their place at the new unit. (Tr.278:10–13) According to Kimbel, Peabody had never been required to specify in a ventilation or air change proposal submitted to MSHA where excess mechanized mining equipment would be stored pending transport from the mine. (Tr.130:20–131:4; 132:16–24)
Chad
Barras[10]
gave the order to have the equipment moved outby the loading point prior to
making the air change so that the escapeway air flow would be preserved until
the equipment was moved. (Tr.272:9–16; 303:24–304:13) Peabody believed this
was consistent with industry practice and in line with section 75.380(b). (Tr.295:14–296:4)
Peabody further believed that once all of the mechanized mining equipment that
had been used to mine at the face of the 2B panel was moved outby the former
loading point, “removal” would be complete, the area would no longer be active,
and escapeways would no longer be required. (Tr.169:6–21) This has long been
the practice and understanding of “removal” at Wildcat Hills. (Tr.169:6–170:3;
198:5–21; 264:19–265:2; 296:2–4) There is no requirement that all of the
equipment be moved within a given time. (Tr.294:4–295:3)
3. Execution
of the Unit 2 Move
Production
at the 2B panel (hereafter “old 2B panel”) stopped on August 26, 2016.
(Tr.171:19–173:14; Ex. R–7) Consistent with the plan, all mechanized mining
equipment was first moved outby the former loading point. (Tr.173:4–11; 189:6–12)
Reynolds testified that most[11]
of the essential equipment was moved to the new mining location before the air
change. (Tr.187:13–188:3) In preparation for the unit move, the area near the
former working face was roof bolted, loose accumulations of coal were back
scooped, and the area was rock dusted. (Tr.173:19–174:2; Ex. R–7 at 3–4)
Under Reynolds’ supervision, Peabody carried out the unit move and air change during the “owl” and day shifts on August 27, 2016. (Tr.124:24–125:4; 131:11–14; 171:4–18; 173:25–174:12; Ex. R–7 at 4–5) One effect of the air change was to change the designation of air courses in the old 2B panel so that they were no longer considered “escapeways,” as required when the unit was in active production. (Tr.162:2–7; 202:19–22) This was accomplished by removing some stops and constructing new stoppings to direct the air into its new course. (Tr.124:15–21) Production at new unit 2 commenced on September 1, 2016. (Tr.174:13–175:4; Ex. R–7 at 8–9)
Although most of the mechanized mining equipment was moved to new unit 2 to resume production, three pieces of equipment — Continuous Miner #234 (CM234), Continuous Miner #235 (CM235), and Feeder Breaker #605 (F605) — were not. New unit 2 did not need CM234 and CM235 because newly rebuilt miners — Continuous Miners Nos. 237 and 238 — had already been sent to new unit 2. (Tr.175:19–177:6; 201:4–11; Ex. R–7 at 8–9) It is not clear from the record why F605 was not needed at new unit 2.
Although
CM234, CM235, and F605 could have been moved completely off the 2B panel before
the air change (Tr.189:17–21), they were left in the crosscuts just outby the
former loading point.[12]
(Tr.44:5–9; 50:8–19; 52:19–21; 302:23–303:15) The decision regarding what to
do with these three pieces of excess mechanized mining equipment was instead deferred.
(Tr.129:21–25; 183:17–187:10) Peabody’s management was certain, however, that
the equipment would not be stored indefinitely in the crosscuts outby the former
loading point on the old 2B panel. (Tr.129:16–20; 192:10–193:15)
B. Inspector
Belford’s Inspection (September 6–8, 2016)
1. September
6, 2016
Enter
now MSHA Inspector Brittan Belford[13]
of the Marion, Illinois field office. (Tr.28:15–24) Belford visited the mine
site on three consecutive days to conduct an E01 Inspection. (Tr.38:10–15;
39:8–14) He was familiar with the mine, having previously conducted three or
four E01 inspections at Wildcat Hills. (Tr.37:25–38:1)
On
the first day, September 6, 2016, Belford arrived at the Wildcat Hills Mine at
7:30 a.m. and met with Douglas Combs[14]
in the mine’s safety office. (Tr.42:20–43:8) The two traveled underground
together to the old 2B panel via the 2A Sub Main.[15] (Tr.43:14–21;
137:8–138:3) Once there, Belford and Combs traveled inby the old 2B travelway
on a stinger ride.[16]
(Tr.91:4–18; 95:10–12; 96:1–5; 138:10–17) Belford observed FB605, CM234, and
CM235 parked outby the former loading point. (Tr.52:12–21) Belford also
observed a lifeline hooked up in the old 2B travelway. (Tr.58:17–21; 95:13–19)
Belford’s notes indicate that no violations were observed up to this point.
(Tr.92:14–93:1; Ex. S–2) Once Belford and Combs traveled the length of the travelway
and reached the end of the panel, they took a left turn and entered into the
left return. (Tr.91:4–23; 138:18–21)
While
in the old 2B left return, their vehicle got stuck. (Tr.139:1–3) Belford and
Combs exited the vehicle and used a man door to enter back into the old
travelway at approximately the 5,700 foot mark.[17]
(Tr.138:24–139:17; 140:2–13; See Ex. J–3) Combs then attempted to use
his mine site cell phone to call for a ride. (Tr.53:3–5; 139:21–22; 140:14–19;
149:17) There was no cell service. (Tr.53:5–7; 139:22–23; 140:20–22; 149:10–17)
Combs and Belford discussed the lack of cell signal and communication
coverage, which was a surprise to both. (Tr.140:20–142:1) At this time,
Belford testified he told Combs that equipment — i.e., FB605, CM234, and
CM235 — was still being removed from the area and, therefore, the travelway was
a secondary escapeway, which required tracking or communication. (Tr.53:8–13)
Combs testified, however, that Belford asked if tracking or
communications were required in the area. (Tr.141:13–14) Combs was unsure but
thought the fact the excess equipment was parked outby the former loading point
was a relevant factor. (Tr.141:15–17) At this point, according to Combs,
neither man was certain. (Tr.141:18–21)
The
two discussed and referenced the federal regulations for an answer but,
according to Combs, could not reach a conclusion. (Tr.53:17–20; 141:22–142:1;
143:5–10) Combs and Belford traveled outby where there was cell service,
called to the surface, and requested a ride for Belford out of the mine.
(Tr.142:4–15)
Once back at the surface, Belford went to the tracking office to speak with Nathan Sumner, the supervisor of tracking and communications.[18] (Tr.53:21–54:2; 93:25–94:5) Sumner explained that because the power center for unit 2 had been moved from the old 2B panel on August 26, 2016, there was no power for a tracking system in the area. (Tr.54:9–16; see also Tr.181:10–18) Sumner told Belford that it would not be a problem to put the power center back in and re-establish communication and tracking. (Tr.55:3–8) Belford testified that he informed Sumner that the old 2B travelway was an escapeway that required communication and tracking; nevertheless, Belford did not issue a citation that day. (Tr.55:13–21) Belford claimed that he was affording the company the opportunity to come into compliance before enforcement action was needed. (Tr.55:22–24)
Later that day while on his way home from work, Barras learned that
Inspector Belford had asked questions about communication and tracking on the
old 2B travelway. (Tr.285:2–12) In Barras’ mind, the equipment in the 2B
panel was “removed” once it was moved outby the former loading point so there
was no need for escapeways and thus no need for communication and tracking.
(Tr.285:14–16) Barras called Marion field office supervisor Mike Rene and expressed
his opinion. (Tr.285:17–22) Rene said he would talk to Belford the next
morning. (Tr.285:22–24) Barras believed that Rene would resolve the issue with
Belford. (Tr.285:25–286:2)
2. September 7, 2016
Belford returned to the mine the next morning, September 7, 2016. (Tr.55:25–56:8) He again went to the safety office and spoke to Combs. (Tr.56:6–11; 144:12–18) Prior to going underground to resume the inspection, Belford asked Combs about the status of tracking and communication in the old 2B travelway. (Tr.56:17–22) Combs responded that they had not installed tracking or communication, did not plan to, and had additionally pulled the lifeline[19] that was in the travelway the previous day. (Tr.56:22–25) Belford recalled telling Combs that the old 2B travelway was still an escapeway, but now it was an escapeway without a lifeline.[20] (Tr.57:1–4)
Belford reviewed the mine map and examination records before returning underground to the old 2B panel. (Tr.57:5–12) He was accompanied by Eric Blackford, a member of Wildcat Hills’ safety team. (Tr.57:13–20) At the old 2B panel, Belford verified the lifeline had been removed. (Tr.57:21–25) Additionally, Belford noted where the last known loading point was, where the excess equipment was, and that the phone at a nearby refuge alternative did not work. (Tr.58:1–9) Belford and Blackford took the right return heading outby and spoke with mine examiner J. Jackson, the miner responsible for conducting pre-shift examinations. (Tr.58:22–59:8; 72:19–73:1) Belford asked Jackson if he knew there was no tracking or communication along the old 2B panel. (Tr.59:11–12) Jackson replied that he was aware and that manual tracking was being used in place of the wireless tracking system.[21] (Tr.59:12–14) The phone system and wireless tracking were not operational because the power source had been taken out during the unit move.[22] (Tr.308:9–15; 309:9–18) At this time, records in the area indicated the old 2B panel was still being pre-shifted three times a day, as if it was still in active production. (Tr.72:1–13)
After speaking with Jackson in the mine, Belford returned to the surface and met with Reynolds[23] and Barras in the staging area.[24] (Tr.60:6–19; 181:21–182:5) Belford asked Reynolds why the lifeline was taken down and communications were not re-established as he had instructed the previous day. (Tr.61:14–17) Reynolds responded that Barras had allowed him to remove the lifeline. (Tr.61:17–19) Reynolds had the lifeline removed because it is not required if there is no active escapeway. (Tr.178:8–179:2) Reynolds explained that it was potentially dangerous to have a lifeline in an airway other than an escapeway since it could give a false impression to miners and lead them in the wrong direction. (Tr.179:3–14) After speaking with Belford about the lifeline issue, Reynolds stood by his view that no escapeway was required because the excess equipment was outby the last former loading point. (Tr.180:16–181:6)
During his conversation with Barras, Belford reiterated that the old 2B travelway was still an escapeway that required a lifeline, communication, and tracking.[25] (Tr.62:24–63:3) Barras adamantly disagreed, stating that because equipment was moved outby the former loading point, they were no longer required to maintain an escapeway and the other requirements associated with it. (Tr.62:17–63:6; 295:14–296:4)
After leaving
the mine that day, Belford returned to the MSHA district office and spoke to
supervisor Bob Bretzman.[26]
(Tr.63:10–14) Around that time, Rene called Barras and told him that he was
passing the issue on to Bretzman because Rene was scheduled to go on vacation.
(Tr.286:9–17; 287:16–288:11) During this call, Rene did not indicate whether
he thought Peabody was in or out of compliance. (Tr.288:3–11) Barras never
heard from or spoke to Bretzman before the citations were issued. (Tr.288:14–17)
3. September
8, 2016
Before
returning to the mine on the morning of September 8, 2016, Belford reviewed the
mine’s Emergency Response Plan and wrote three citations: Nos. 9039355,
9039356, and 9039357. (Tr.63:18–64:5; 289:6–14) Belford then traveled back to
the mine and went to the safety office where he met with Mike Cummins, a member
of the mine’s safety staff, to give him the paperwork for the citations.
(Tr.64:12–65:4) Belford spoke again with Barras. (Tr.65:5–11) Barras reiterated
his position that the area was no longer an escapeway and the tracking system,
lifeline, and refuge alternative were no longer required. (Tr.65:18–66:3)
Belford repeated his position that an escapeway was needed because Wildcat
Hills was still removing mine equipment — CM234, CM235, and FB605 — from that
area. (Tr.66:4–8) The two went to Barras’ office and called Belford’s field
office supervisor, Bob Bretzman, for a conference call. (Tr.65:5–17; 66:18–22)
4. Abatement
and Termination of Citations
On
September 12, 2016, Belford terminated all three citations after Peabody
re-established the escapeways in the old 2B panel. (Tr.312:12–313:10; Ex. S–2
at 3, 6, 10) Citation No. 9039355 was terminated after Peabody received
approval from MSHA for a manual check-in/check-out system in the old 2B panel,
which also included a requirement that miners re-report in every two hours.
(Tr.102:3–11; 292:11–294:1; Ex. S–2 at 10) Citation No. 9039356 was terminated
after Peabody installed a continuous durable lifeline in the old 2b secondary
escapeway.[27]
(Tr.79:10–15; Ex. S–2 at 3) Citation No. 9039357 was terminated after Peabody
re-established communication at the old 2B refuge alternative by use of a mine
phone. (Ex. S–2 at 6)
As
part of the abatement of these citations, MSHA did not require that FB605,
CM234, or CM235 be moved within a specified time period. (Tr.294:4–295:3)
Nonetheless, they were eventually moved out of the mine between September 8,
2016, and January 2, 2017. (Tr.299:13–303:4)
IV. FURTHER FINDINGS OF FACT AND
CREDIBILITY
A. Eslinger’s
Testimony
Respondent’s
witness Mark Eslinger[28]
is a former MSHA civil engineer with extensive experience with ventilation
work. (Tr.205:10–208:11) He served as the supervisory mining engineer for
ventilation in MSHA’s District 8 office in Vincennes, Indiana — the same
district where the Wildcat Hills mine is located — for more than 25 years. (Tr.207:11–209:1)
Eslinger supervised ventilation inspectors who enforced MSHA ventilation
regulations. (Tr.209:14–210:8) After retiring from MSHA in 2009, Eslinger
worked as general safety manager over three underground mines in District 8.
(Tr.209:2–13; 211:18–212:2; 233:22–234:15) In this capacity, Eslinger was
personally involved in the planning and execution of several unit moves, which
included air changes. (Tr.233:22–235:9)
1. Subpart D–Ventilation Rewrite
Committee 1985–1988
On
January 28, 1985, MSHA established a task force to study commonly employed
practices and equipment used in longwall mining. 53 Fed. Reg. 2,382-01, 2,382–83
(Jan. 27, 1988). Eslinger participated on this task force and assisted in
rewriting Subpart D of the 300 series ventilation regulations, sections 75.300
through 75.398, which included the escapeway regulation in question here.[29] (Tr.212:3–19)
In 1988, MSHA issued its proposal for Subpart D–Ventilation. (Tr.216:6–17; 53
Fed. Reg. at 2,382)
2. Pyro Mining Company Disaster
In
September 1989, an explosion at Pyro Mining Company’s William Station No. 9
mine in Kentucky claimed the lives of 10 miners.[30]
(Tr.217:11–14) Eslinger was one of the chief investigators in the
post-event investigation into the causes of the tragedy.[31] (Tr.217:7–18)
The investigation committee found that a ventilation change, which directed air
to the new longwall panel, Longwall Panel P, was made on shift. (Tr.221:5–8)
As a result, methane gas had accumulated at the longwall face while miners were
still disassembling the equipment at Longwall Panel O. (Tr.217:25–218:13;
220:23–221:5) The investigation committee concluded that the likely source of
ignition was a flame from a cutting torch.[32]
(Tr.221:12–15) The investigative team subsequently wrote a report, which
became widely known in the mining industry. (Tr.221:16–25)
3. The 1992 Final Rule for Subpart
D–Ventilation
The
specific events at the William Station mine prompted the ventilation committee to
rewrite portions of the ventilation regulations before the 1992 final rule was
issued. After significant discussion, the rewrite committee concluded that if
sufficient ventilation had been maintained until after all the mechanical
equipment had been dismantled and moved away from the face, lethal conditions could
have been avoided at the William Station mine. (Tr.222:21–223:9) Thus, one of
the revisions the rewrite committee worked on was a clarification that
escapeways must be maintained during both the installation and removal of
equipment at the working face. (Tr.222:19–223:15; 57 Fed. Reg. 20,868-01,
20,894 (May 15, 1992)) Prior to this, there was no express requirement that
escapeways be maintained with the attendant requirement for separate and
supplemental escapeway ventilation during installation or removal. (Tr.222:7–18;
226:11–16; see 53 Fed. Reg. at 2,382)
The
final rule was issued in 1992. 57 Fed. Reg. at 20,868. The new requirement that
two escapeways be maintained as equipment was being installed or removed from an
area was added. (Tr.223:10–15; 232:12–14; 233:3–9; 57 Fed. Reg. at 20,904; 30
C.F.R. § 75.380(b)(1)) Eslinger testified the rule became widely known
through a series of well-attended informational meetings held around the
country. (Tr.224:19–225:1) The escapeway standard was one of the topics
covered in these meetings. (Tr.226:8–19) The specific point of when “removal”
was complete was also covered. (Tr.226:20–22) According to Eslinger, removal
was considered complete when all of the face equipment had been moved outby the
last loading point and the loading point was decommissioned. (Tr.226:23–227:20)
Eslinger explained the logic behind this: once equipment is moved outby the
loading point, the risk level drops considerably. (Tr.248:18–22) Methane is
most often liberated at the working section during mining (or shortly
thereafter) and not as likely liberated outby the loading point. (Tr.249:2–4;
250:12–19) Additionally, the chance for explosions decreases because there
would be no cutting and welding by the time all of the equipment is moved outby
the loading point.[33]
(Tr.248:22–249:10)
This
interpretation was disseminated throughout District 8 during Eslinger’s tenure,
until his retirement in 2009. (Tr.227:24–228:19; 265:19–21) Eslinger
testified this interpretation was a matter of agency culture; it was never
reduced to a formal written policy statement. (Tr.228:24–229:16) Similarly,
Eslinger’s interpretation of “removal” is not covered in any of MSHA’s Program
Policy Manuals (PPM). (Tr.244:9–16) Until September 8, 2016, to Eslinger’s
knowledge, MSHA never contradicted this practice. (Tr.235:10–22)
B. Eslinger’s
Credibility
The
Secretary uses a generous portion of his briefs challenging Eslinger’s testimony.
The Secretary argues Eslinger’s testimony is (1) irrelevant (Sec’y Br. 21–23,
25–26; Sec’y Reply Br. 3–4); (2) inconsistent with the plain language and
intent of the regulation (Sec’y Br. 21–22, 24–26; Sec’y Reply Br. 3–4) ; and,
(3) factually implausible (Sec’y Br. 21–23, 26; Sec’y Reply Br. 3–4)
The
Secretary argues Eslinger’s testimony is irrelevant because he has not been
employed by MSHA in nearly a decade and admittedly has no authority to speak on
MSHA’s behalf. (Sec’y Br. 23) Additionally, even if he were still working for
MSHA, Eslinger’s view would not be binding on the Secretary as it does not “represent
an official position” of the agency. (Id.; Sec’y Reply Br. 3) While
this is true, it does not preclude me from crediting the factual portions of Eslinger’s
testimony without reference to his ultimate legal conclusion.
The
Secretary next argues Eslinger’s interpretation is at odds with the safety
objective of the escapeway regulation. (Sec’y Br. 21–22; Sec’y Reply Br. 3–4)
Notably, the Secretary states that “[t]he fact equipment is moved past the
former loading point does not eliminate the hazards associated with equipment
removal.” (Sec’y Br. 25) As discussed in detail below, Eslinger’s
interpretation is closely compatible with the specific escapeway-related safety
concerns enumerated in the preambles. See discussion infra Section
VI. B.
Finally,
the Secretary argues Eslinger’s testimony was factually implausible because Eslinger’s
interpretation is not found in the extensive regulatory history of the escapeway
standard. (Sec’y Br. 24) While it is true the various Subpart D-related
sections in the Federal Register do not explicitly clarify when “removal” is
complete, as outlined below, there is ample evidence to support Eslinger’s
position. See discussion infra Section VI. B. The Secretary additionally
claims to have serious doubts about Eslinger’s factual recounting, stating that
the six public meetings Eslinger mentioned at the hearing took place before the
William Station mine disaster — a temporal impossibility given that the
“removal” language of the escapeway regulation was added in response to the
disaster. (Sec’y Br. 24–25) It appears, however, the Secretary either misunderstood
or misconstrued Eslinger’s statement. Eslinger’s statement about the six
informational meetings starts on page 223 of the transcript. (Tr.223:20) Indeed,
while speaking about the six public meetings in 1988, Eslinger specifically mentioned
Grand Junction, Colorado (Tr.223:25–224:1), one of the locations listed in the
Federal Register and cited by the Secretary. (Sec’y Br. 24; 57 Fed. Reg. at
20,868) However, on page 224, Eslinger began talking about the 1992 final rule
and the subsequent informational meetings. (Tr.224:4–225:15) Thus, Eslinger
described two sets of meetings: (1) the six public meetings in 1988 and
(2) the three informational sessions after 1992. The Secretary’s failure to
understand this detail is not a negative reflection of Eslinger’s credibility.
I
have no reason to doubt the relevance and applicability of Eslinger’s testimony
about how the escapeway requirement came into existence, his role in
investigating the William Station mine disaster, or his role in updating the
ventilation regulations. Nevertheless, even if I were to discredit Eslinger
under any of the Secretary’s various theories (which I am not), I need not rely
on Eslinger’s testimony to reach my conclusion. A thorough review of the Federal
Register confirms many of his factual statements, insofar as I am able to make various
inferences, which leads me to an interpretation regarding section 75.380(b).
C. Respondent’s
Employee-Witnesses’ Credibility
The
Secretary also criticizes Respondent for relying on the “self-serving”
testimony of its witness managers. (Sec’y Reply Br. 5) The Secretary uses this
blanket proposition as an attempt to discredit Respondent’s witnesses, but such
a broad argument is not very convincing. It ought to go without saying that a
party’s own witnesses tend to support said party’s contentions. I will
not reject the testimony of Respondent’s witnesses strictly on the basis of a
current or former employment relationship. See Cannelton Indus., Inc.,
20 FMSHRC 726, 731–32 (July 1998) (citing Breeden v. Weinberger, 493
F.2d 1002, 1010 (4th Cir. 1974)). Similarly, the fact that Respondent’s
witnesses’ testimonies do not conform to the Secretary’s theory is an
insufficient reason to discredit or disqualify them.
Of
Respondent’s four employee-witnesses, only Reynolds and Barras spoke in detail
about the historical application of the escapeway provision in District 8. Reynolds
and Barras both testified that they learned about removal of equipment, as it
pertains to section 75.380(b), in the same manner Eslinger described, and they have
taught and applied it that way since 1992. (Tr.169:6–170:3; 264:21–24) Barras’
interpretation of what “removed” means was informed by his participation in a
public information meeting, a possible phone call with Eslinger to get
clarification, and years of doing it that way, including while working as an
MSHA inspector in District 8. (Tr.265:19–266:1; 297:5–20) Reynolds’
interpretation was based on his four decades of mining experience, the way air
changes have been done since 1992, what he was trained and told to do, and his
understanding of how it is done everywhere in the region. (Tr.197:8–200:12) Barras
had never heard of any change in this view of when “removal” is complete. (Tr.267:4–10)
Both witnesses were internally consistent in their testimony, have decades of
combined mining experience in District 8, and their actions between September
6–8 were consistent with their statements at the hearing. I see no reason to
discredit their testimony about their personal work history and understanding
of the escapeway provision.[34]
V. PRINCIPLES OF LAW
Where
the language of a regulatory provision is clear, the terms of that provision
must be enforced as they are written unless the regulator clearly intended the
words to have a different meaning or unless such meaning would lead to absurd
results. Jim Walter Res., Inc., 28 FMSHRC 579, 587 (Aug. 2006) (citing Dyer
v. United States, 832 F.2d 1062, 1066 (9th Cir. 1987); Utah Power &
Light Co., 11 FMSHRC 1926, 1930 (Oct. 1989)). In determining the meaning
of regulations, the Commission “utilizes ‘traditional tools of [. . .]
construction,’ including examination of the text and the intent of the
drafters.” Amax Coal Co., 19 FMSHRC 470, 474 (Mar. 1997) (quoting Local
Union 1261, UMWA v. FMSHRC, 917 F.2d 42, 44–45 (D.C. Cir. 1990)). The meaning
of a regulation is “ascertain[ed] [. . .] not in isolation, but rather in the
context in which those regulations appear.” Wolf Run Mining Co., 32
FMSHRC 1669, 1681 (Dec. 2010) (citing RAG Shoshone Coal Corp., 26 FMSHRC
75, 80 n.7) (Feb. 2004)). As recently articulated by the Supreme Court in Kisor
v. Wilkie, a court should not afford Auer deference (established in Auer
v. Robbins, 519 U.S. 452 (1997)) unless the regulation is genuinely
ambiguous. 588 U.S. ___ (2019) (slip op. at 13) (citing Christensen v.
Harris Cty, 529 U.S. 576, 588 (2000); Bowles v. Seminole Rock & Sand
Co., 325 U.S. 410, 414 (1945)). Before concluding that a rule is genuinely
ambiguous, a court must first exhaust all the “traditional tools” — the text,
structure, history, and purpose — of construction. Id. at __–__ (slip
op. at 13–14).
If a regulatory provision is found to be ambiguous, the agency’s interpretation of that provision is entitled to deference if it is found to be reasonable. See Drilling & Blasting Syst., Inc., 38 FMSHRC 190, 194 (Feb. 2016) (citing Auer, 519 U.S. at 452). However, “an agency’s [. . .] interpretive authority is not unfettered.” Hobet Mining Co., 26 FMSHRC 890, 899 (Nov. 2004) (ALJ). Deference to the agency’s interpretation is inappropriate if its interpretation is not reasonable, when it is plainly erroneous or inconsistent with the regulation, or if it does not reflect the agency’s fair and considered judgment. Drilling & Blasting Syst., 38 FMSHRC at 194 (citing Auer, 519 U.S. at 461; Christopher v. Smith-Kline Beecham Corp., 567 U.S. 142, 154 (2012)); see also U.S. v. Mead Corp., 533 U.S. 218, 228 (2001) (finding that the amount of deference to which an agency is entitled depends on, among other things, the agency’s consistency and persuasiveness of its position). Additionally, the regulatory interpretation must be one “actually made by the agency.” Kisor, 588 U.S. at __ (slip op., at 15). In other words, it must be the agency’s “authoritative” or “official position,” rather than an ad hoc statement not reflective of the agency’s views. Id.
As the Supreme Court has explained, an agency’s interpretation may not reflect its fair and considered judgment when it conflicts with a prior interpretation. Christopher, 567 U.S. at 155; cf. Pauley v. BethEnergy Mines, Inc., 501 U.S. 680, 698 (1991) (court considered longstanding and consistent interpretation as a factor on whether to defer); see also Thomas Jefferson Univ. v. Shalala, 512 U.S. 504, 515 (1994) (stating that a regulatory interpretation that conflicts with a prior interpretation is “entitled to considerably less deference than a consistently held agency view”). Courts should not give deference to an agency’s reading except to the extent it has the “power to persuade.” Christopher, 567 U.S. at 159. The Secretary bears the burden of establishing the factors necessary to afford his position deference. See Peabody Twentymile Mining LLC, 39 FMSHRC 1323, 1332 (July 2017) (declining to grant the Secretary’s position Auer deference when he failed to establish such a factor), argued, No. 17-9540 (10th Cir. Mar. 22, 2018).
VI. DISCUSSION AND ANALYSIS
The
central issue before me is whether the old 2B panel required escapeways at the
time of Inspector Belford’s inspection. The Wildcat Hills mine had three
active units. Each of the units ran continuous mining machines and feeders.
The parties agree that an escapeway starts at the former loading point and
continues out of the mine. (Tr.36:8–11; 37:4–5; 305:3–11) The parties also
agree the old 2B panel was still being pre-shifted by examiners after the air
change, which occurred on August 27, 2016. (Tr.72:4–6; 307:16–20) Belford
considered the old 2B panel a working area because it was being pre-shifted
three times a day, and, in his mind, equipment was still being removed from the
area.[35]
(Tr.36:14–17; 66:6–8; 71:17–18; 72:4–6; 81:8–18; 103:1–2)
As
a preliminary matter, I conclude the fact that the old 2b panel was being
pre-shifted three times a day by examiners does not mean that the old 2b panel
was an active working area or that mechanized mining equipment was still being
removed.
Active
workings are “any place in a coal mine where miners are normally required to
work or travel.” 30 C.F.R. § 75.2. By contrast, a worked out-area is “an area
where mining has been completed [. . .] excluding developing entries, return
air courses, and intake air courses.” 30 C.F.R. § 75.301. If a portion of a
mine is not in active production, and no one is scheduled to work there, the
examination frequency is reduced to once a week. (Tr.161:23–162:10; 30 C.F.R.
§ 75.364) In the event that work is planned to be done in worked-out panels,
e.g., pre-planning or job testing, a pre-shift examination must be conducted
even though there is no production. (Tr.154:19–155:4; 193:19–22; 194:7–12; 30
C.F.R. § 75.360(b)(10)) Importantly, escapeways are not required in worked-out
areas of the mine even though miners go there to perform weekly examinations or
to conduct repairs. (Tr.282:10–12)
Here, the record is clear that mining on the old 2b panel ceased on August 26, 2016. (Tr.173:4–14; Ex. R–7 at 2–3) The new unit 2 was operational and coal was being mined as early as September 1, 2016, five days before Inspector Belford’s inspection. (Tr.174:24–175:4; Ex. R–7 at 8) Belford relied on the fact that the old 2B panel was being pre-shifted three times a day to conclude that the area was active and an escapeway was necessary. (See Tr.72:4–6) But without further information, his conclusion does not follow from the frequency of examinations. It is clear that no coal was being mined at the old 2b panel in September 2016. But, it is not clear what type of work was being done to necessitate pre-shift examinations. (See Ex. S–2 at 19) It is the Secretary’s burden to show by a preponderance of the evidence that the work being done in the old 2b panel during Belford’s inspection was the type of work that not only required pre-shift examinations but also required escapeways. The fact that parts of the old 2b panel were being pre-shifted three times a day does not in and of itself make the old 2b panel active, requiring an escapeway. As was explained in testimony, various types of work can be required in worked-out mine areas, such as clean-up and maintenance. Any time that type of work is done, a pre-shift examination is required, even though the area is in a worked-out area. But, this type of maintenance work does not require the establishment of an escapeway. Once the work is done, the examination frequency reverts to weekly, and as before, no escapeway is required.
If
I were so inclined, I could end the discussion here. Nevertheless, I will
continue on with a full analysis of the escapeway regulation. The inquiry turns to whether the escapeway
regulation, particularly the language regarding the removal process, is clear
or ambiguous. If the regulation is ambiguous, the question is whether the
Secretary is entitled deference. For the reasons that follow below, I conclude
the Secretary is not.
A. The
Escapeway Regulation is Ambiguous
The escapeway regulation states:
(b)(1) Escapeways shall be provided from each working section, and each area where mechanized mining equipment is being installed or removed, continuous to the surface escape drift opening or continuous to the escape shaft or slope facilities to the surface.
(2) During equipment installation, these escapeways shall begin at the projected location for the section loading point. During equipment removal, they shall begin at the location of the last loading point.
30
C.F.R. §§ 75.380(b)(1),(2) (emphasis added).
Thus,
escapeways are required in two instances: (1) at each “working section” and (2)
at each “area where mechanized mining equipment is being installed or
removed.” Where the language of a regulatory provision is clear, the terms of
that provision must be enforced as they are written unless the regulator
clearly intended the words to have a different meaning or unless such meaning
would lead to absurd results. Jim Walter Res., 28 FMSHRC at 587.
Working sections are defined as “all areas of the coal mine from the loading
point of the section to and including the working faces.” 30 C.F.R. § 75.2.
This much is clear.
It
is not immediately evident, however, what constitutes “removal” or what the
parameters of the “area where mechanized mining equipment is being [. . .]
removed” are. Despite this, both parties assert in their briefs that the plain
language of the regulation is clear. (Sec’y Br. 14; Resp’t Br. 18) When both
parties advance competing claims that the regulation is “plain,” such as is the
case here, it may indicate ambiguity. Canyon Fuel Co. v. Sec’y of Labor,
894 F.3d 1279, 1290 (10th Cir. 2018) (stating that both parties advanced
plausible interpretations of the regulation’s plain language and that the
regulation is ambiguous); Walker Stone Co. v. Sec’y of Labor, 156 F.3d
1076, 1081 (10th Cir. 1998); Alcoa Alumina & Chems., L.L.C., 23
FMSHRC 911, 914–15 (Sept. 2001). In determining the meaning of regulations,
the Commission “utilizes ‘traditional tools of [. . .] construction,’ including
examination of the text and the intent of the drafters.” Amax Coal, 19
FMSHRC at 474. The meaning of a regulation is “ascertain[ed] [. . .] not in
isolation, but rather in the context in which those regulations appear.” Wolf
Run Mining, 32 FMSHRC at 1681. As recently stated by the Supreme Court, a
court must exhaust the “traditional tools” of construction and “cannot wave the
ambiguity flag” prematurely because the regulation is merely difficult to
understand. Kisor, 588 U.S. at ___ (slip op. at 14). I will analyze both “removal” of equipment and the
“area” where equipment is being removed below.
1. “Removal”
The
parties do not agree on what constitutes “equipment removal.” The Secretary
envisions “removal” as a process of physically moving the equipment out of the
“area.” The Secretary does not commit to a
concrete definition of “removal” but states “the equipment removal process involves
transporting dangerous equipment through the mine, often requiring the use of
additional dangerous machinery to provide transport.” (Sec’y Br. 16) (emphasis
added). It is not clear from his briefs, however, whether he thinks “removal” also
involves disassembly of mechanized mining equipment or lacing of cables.
In
contrast, the Respondent draws a line between
disassembly and transportation. During the hearing, whenever the Secretary’s
counsel used the word “removal” to indicate the physical moving of mining
equipment (Tr.298:22; 301:15–16; 304:20; 305:14), Respondent’s counsel objected
(Tr.299:1–4; 301:18–19; 305:16–19), arguing the term “removed” in the context
of section 75.380(b) is a “very weighted term” and “a term of art.” (Tr.298:25–299:7)
Respondent’s
post-hearing brief, however, gives the impression Respondent does not disagree
that removal of mechanized mining equipment involves at least some degree of
physical movement or transportation. For example, Respondent’s post-hearing
brief states its position that removal is completed once all section equipment
is “moved outby the location of the former loading point.” (Resp’t Br.
18, 20) (emphasis added).
However, in its reply brief, Respondent readopts and rearticulates its position from the hearing that “removal” of mechanized mining equipment is “distinct from transportation.” (Resp’t Reply Br. 9) Notably, Respondent cites that the William Station mine disaster, on which the escapeway equipment removal language was predicated, “did not involve transportation.” (Id. at 10) Thus, Respondent argues section 75.380(b)(1) does “not contemplate transportation of equipment from place to place.” (Id.) Respondent then argues that removal activity — for example, cutting, disconnecting, or lacing cables — is “distinguishable from mere transportation.” (Id.) According to Respondent, removal activities are steps taken to “aid in transportation” but are distinct from it. (Id.)
This is peculiar. Although Respondent cites heavily to Eslinger’s testimony to support its contentions here, Eslinger himself stated unambiguously that disassembling of machinery is part of removal. (Tr.257:23-258:5) Respondent’s own language in its post-hearing brief that removal is completed “once all section equipment is moved outby the location of the former loading point” (Resp’t Br. 18) (emphasis added) also contradicts its apparent position that “removal” does not involve any transportation. These two seemingly contradictory positions can be reconciled, however, if “transportation” and “move[ment]” are discrete concepts. If such a distinction exists, neither the Respondent (nor the Secretary) has yet to expound on it.
I am similarly unpersuaded by Respondent’s position that “removal”
is a term of art. There is nothing in the plain language of the regulation or
even the regulatory history to support the position that “removal” is a
technical term that limits the process to only the disassembly or cable lacing
steps. Words that are not technical in nature are to be given their usual,
natural, plain, ordinary, and commonly understood meaning. W. Fuels-Utah,
Inc., 11 FMSHRC 278, 283 (Mar. 1989) (citing Old Colony R.R. Co. v.
Comm’r of Internal Revenue, 284 U.S. 552, 560 (1932)). To my knowledge, to
date, neither the Commission nor its ALJs have had to define the word “remove”
or “removal.” Remove means “[t]o move from a place or position occupied; to transfer
or convey from one place to another; to take off; to take away; to withdraw.” Remove,
The Am. Heritage Dictionary of the English Language 1476 (4th ed. 2009); see
also Webster’s Third New Int’l Dictionary 1921 (3d ed. 1993) (“to change or
shift the location, position, station, or residence of; to move by lifting,
pushing aside, or taking away or off”). Removal means “[t]he act of removing;
the fact of being removed; relocation, as of a residence or business.” Removal,
The Am. Heritage Dictionary of the English Language 1476 (4th ed. 2009); see
also Webster’s Third New Int’l Dictionary 1921 (3d ed. 1993) (“[t]he act of
removing or fact of being removed; shift of location”).
Thus,
I conclude that “removal” in section 75.380(b) involves at least some degree of
physical transportation or movement of mechanized mining equipment.
2. “Area”
The more important question before me is the extent of such physical transportation or movement. The language of the regulation reads: “Escapeways shall be provided from each working section, and each area where mechanized mining equipment is being [. . .] removed [. . .] .” 30 C.F.R. § 75.380(b)(1). With respect to this second condition, once the mechanized mining equipment is removed from the “area” — whatever that is determined to mean — removal is complete and escapeways are no longer required. Unfortunately, the definition section in the regulation is of no assistance here. Similarly, a standard American English dictionary does not give any meaningful guidance.[36]
The
parties interpret the relevant “area” in vastly different ways.[37]
According to the Secretary, the relevant “area” is the entirety of the old 2b
panel (Sec’y Br. 14, 17, 19–20, 29, 31),[38] which spans a distance
of 8,920 feet. (Tr.52:7; Ex. J–3) By contrast, Respondent argues that the
relevant “area” is based on the former working section, that is to say the area
from the former loading point inby to the former working face (Resp’t Br. 18,
20–21), a distance of approximately 360 feet. (Tr.52:5–8; Ex. J–3) Despite
the fact that the Secretary’s interpretation yields a result 25 times larger
than Respondent’s, both interpretations of “area” are facially plausible.
According
to the Secretary, had Respondent fully removed the equipment from the old 2B
panel prior to making the air change, escapeways would not have been required
because the old 2B panel “would no longer constitute an area from which
equipment was being removed.” (Sec’y Br. 20) In support of his interpretation
that “area” in section 75.380(b) means the old 2B panel, the Secretary cites
repeatedly to the plain language of the regulation. (Sec’y Br. 2, 10, 12, 14–15,
17–18, 21, 36; Sec’y Reply Br. 1, 2, 4) However, the word “panel” does not
appear anywhere in section 75.380. See 30 C.F.R. § 75.380. In all of
Subpart D as currently written, the word “panel” only appears nine times. See
30 C.F.R. §§ 73.333; 75.335; 75.351. Two of the “panels” relate to
strength tests for building construction. See 30 C.F.R. § 75.333. Four
of the “panels” relate to seals constructed to separate the active longwall
panel from the longwall panel previously mined. See 30 C.F.R. §
75.335. The final three “panels” relate to carbon monoxide and smoke
monitors. See 30 C.F.R. § 75.351. Similarly, the word “unit” does not
appear in section 75.380. See 30 C.F.R. § 75.380. Thus, the plain
language does not clearly support the Secretary’s contention that “area” in
section 75.380(b) is referencing the entirety of the panel.[39]
Respondent
argues the meaning of “area” is clear once one understands the purpose and
context of section 75.380(b). (Resp’t Br. 18) However, even after an
exhaustive review of the Subpart D regulations as well as the various Federal
Register preambles pertaining to Subpart D, see discussion infra Section
VI. B., although strongly supported, I cannot conclude that Respondent’s
interpretation is plainly evident either.
Upon
review of the plain language of section 75.380(b) as well as the definition
section in section 75.2, and as evident by the clearly diverging
interpretations proffered by the parties, I conclude the term “area” as used in
section 75.380(b) is ambiguous.
B.
The Secretary is not Entitled to Deference Because His Interpretation
does not show the Agency’s Fair and Considered Judgment
Having
found above that section 75.380(b) is ambiguous, I am to give deference to the
Secretary’s interpretation if it is found to be reasonable. See Drilling
& Blasting Syst., 38 FMSHRC at 194 (citing Auer, 519 U.S. at 452).
However, as recently articulated by the Supreme Court, Auer deference
does not always apply; in fact, “it often doesn’t.” Kisor, 588 U.S. at
___ (slip op. at 18). Deference to the agency’s interpretation is
inappropriate if its interpretation is not reasonable, when it is plainly
erroneous or inconsistent with the regulation, or if it does not reflect the
agency’s fair and considered judgment. Drilling & Blasting Syst.,
38 FMSHRC at 194 (citing Auer, 519 U.S. at 461; Christopher,
567 U.S. at 155); see also Mead Corp., 533 U.S. at 228 (finding
that the amount of deference to which an agency is entitled depends on, among
other things, the agency’s consistency and persuasiveness of its position). Additionally,
courts should not give deference to an agency’s reading except to the extent it
has the “power to persuade.” Christopher, 567 U.S. at 159.
As
the Supreme Court has explained, an agency’s interpretation may not reflect its
fair and considered judgment when it conflicts with a prior interpretation. Christopher,
567 U.S. at 155; cf. BethEnergy Mines, 501 U.S. at 698 (court
considered longstanding and consistent interpretation as a factor on whether to
defer); see also Thomas Jefferson Univ., 512 U.S. at 515 (stating
that a regulatory interpretation that conflicts with a prior interpretation is
“entitled to considerably less deference than a consistently held agency view”).
The Secretary bears the burden of establishing the factors necessary to afford
his position deference. See Peabody Twentymile Mining LLC, 39
FMSHRC at 1332 (declining to grant the Secretary’s position Auer
deference when he failed to establish such a factor), argued, No.
17-9540 (10th Cir. Mar. 22, 2018).
I
am convinced the position taken by the Secretary is unreasonable and deserves
no deference for three reasons. First, the Secretary has failed to provide
sufficient evidence to support that his interpretation is reasonable or the
result of the agency’s fair and considered judgment. Second, when applied to
section 75.380(b), the Secretary’s interpretation of “area where mechanized
mining equipment is being installed or removed” is logically inconsistent.
Finally, when applied to other similar sections in Subpart D, the Secretary’s
interpretation of “area where mechanized mining equipment is being installed or
removed” leads to absurd results. I will address each in turn.
1. The
Secretary has Failed to Provide Sufficient Evidence to Support his
Interpretation that the “Area” in Section 75.380(b) is the Old 2B Panel
The
Secretary’s briefs state at least two dozen times that the relevant “area” the
mining equipment must be removed from is the old 2B panel. (Sec’y Br. 3, 6–8,
10–11, 14–15, 17–20, 29, 31; Sec’y Reply Br. 1–2, 4–5) As justification for
this, the Secretary cites repeatedly to the plain language (Sec’y Br. 2, 10,
12, 14–15, 17–18, 21, 36; Sec’y Reply Br. 1–2, 4), the regulatory intent,
(Sec’y Br. 12, 17, 21, 25– 27; Sec’y Reply Br. 2, 4–5), the regulatory history,
(Sec’y Br. 16, 21, 23–24, 27; Sec’y Reply Br. 3–4), and various preambles.
(Sec’y Br. 16–17, 21, 26; Sec’y Reply Br. 2, 4)
Beyond
this level of generality, however, there is little if any exposition of how he
arrives at his conclusion. An example of this can be seen on page 15 of the
Secretary’s post-hearing brief. The first line correctly cites the language in
the regulation: “areas where mechanized mining equipment is being
removed.” (Sec’y Br. 15) (emphasis added) But, after citing case law on
determining whether a standard is plain or ambiguous, the Secretary states,
“[i]n this case, because equipment was being removed from the Old 2B panel
[. . .] .” (Id.) (emphasis added) The Secretary seemingly pulls the “old
2B panel” language out of nowhere and merely substitutes it for the “area” he
cited a moment earlier. This logical legerdemain permits the Secretary to
avoid addressing the fundamental question before me: Why it is
reasonable to think the old 2B panel is the “area” where mechanized mining
equipment is being removed from. The Secretary cannot assume away his burden.
Likewise, I cannot assume the Secretary has a good reason for his policy
choice: The Secretary is obliged to supply a rationale and articulate a
reasoned judgement as to why his interpretation must be adopted. See Motor
Vehicle Mfrs. Ass’n v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29, 43 (1983).
The Secretary’s persistent citing to the regulatory intent,
regulatory history, and preambles, while authoritative at first glance, lacks
persuasive strength when placed under scrutiny. This is not to say the
Secretary did not at times point to specific language in the Federal Register.
Between both of his briefs, the Secretary cited or referenced specific language
in the Federal Register several times. (Sec’y Br. 16, 23–24, 26, 26 n.10, 29;
Sec’y Reply Br. 4) However, none of his citations helped support the major
contention that “area” in section 75.380(b) means the old 2b panel.
“Area(s) Where
Equipment is Being Installed or Removed” Mirrors the Term “Working Section”
As
discussed above, see discussion supra Section IV. A. 3, the
phrase “area(s) where equipment is being installed or removed,” which is at the
heart of this litigation, did not appear in the 1988 preamble or draft
language.[40]
See 53 Fed. Reg. 2,382 et seq.
Consistent
with Eslinger’s testimony about the Pyro Mining Company’s William Station No. 9
Mine disaster and how his investigative committee’s findings prompted the
ventilation committee to rewrite portions, see discussion supra Section
IV. A. 3, the 1992 Federal Register states:
The specific reference in the final rule requiring preshift examination of areas where equipment is being installed or removed has been added to clarify the existing rule. The Agency has always considered these areas to be subject to the requirements of the preshift examination; however, an investigation following an explosion at the William Station Mine indicated that some confusion existed on this issue.
57 Fed. Reg. at 20,894 (emphasis added). MSHA subsequently added the phrase or
close variant of the phrase “area(s) where equipment is being installed or
removed” [41]
17 times in the 1992 preamble and 12 times in the then-newly promulgated
regulations. 57 Fed. Reg. 20,868 et seq.
The
first explanation in the Federal Register[42]
about mechanized mining equipment being “installed or removed” provides useful
context:
Areas where coal
is being extracted or mechanized mining equipment is being installed or removed are typically
the places in any underground mine where methane accumulation and other hazards
to health or safety can develop quickly when ventilation is interrupted. To
avoid exposure of miners to these hazards, timely withdrawal of persons is an
important safety practice. Requiring withdrawal from the working section
means that miners must be withdrawn out by [sic] the section loading point. In
areas where equipment is being installed or removed and the loading point has
not been established or has been removed, withdrawal is to be to the
anticipated location of the loading point or to the last location of the
loading point.
57
Fed. Reg. at 20,875 (emphasis added). This language highlights two critically
important points: (1) methane accumulations develop quickly when ventilation is
interrupted, especially at the working face (i.e., “[a]reas where coal is being
extracted”) and (2) MSHA’s intention that “areas where equipment is being
installed or removed” be made in reference to the (anticipated or former)
loading point and mirrors the working section.
MSHA
reemphasizes the danger of methane accumulations throughout the preambles. The
general discussion section of the preamble in 1992 states that the Subpart D
regulations are aimed at protecting against “mine fires and explosions due in
part to the presence of explosive gases in underground coal mines;
oxygen-deficient atmospheres; and accumulations of other harmful gases.” 57
Fed. Reg. at 20,868. Additionally, the general discussion states that
ventilation is a primary method of controlling and mitigating miners’ exposures
to respirable dust to prevent the development of pneumoconiosis. Id.
The preamble discussion about escapeways states, “[e]scapeways are the primary
means of escape for miners during a mine fire or similar life-threatening
emergency.” Id. at 20,904; see also 61 Fed. Reg. at 9,810
(“[w]hen a fire, explosion or other emergency necessitates an immediate
evacuation of a mine, the designated route for miners to leave the mine is the
escapeway”); 53 Fed. Reg. at 2,408 (“[e]scapeways are the primary means of
egress during a mine fire or similar life-threatening situation”).
Given
the above, the “area” during installation and removal of mechanized mining
equipment that MSHA was most concerned with logically appears to have been
where “accumulation and other hazards to health or safety can develop quickly
when ventilation is interrupted.” 57 Fed. Reg. at 20,875. In other words, in the
case of mechanized mining equipment removal, the place (former active face)
where coal was formerly being extracted, i.e., the former working section.
MSHA
reemphasizes the relationship between the “working section” and “area(s)” where
mechanized mining equipment is/are being installed or removed in the discussion
section for escapeways in bituminous and lignite mines:
Paragraph
(b)(2) recognizes that during the installation or removal of mechanized mining
equipment, the term working section, as defined, may not be
appropriate because in one case the loading point may not yet be located by
the installation of a belt tailpiece or feeder and in the other, it may have
already been removed. In these cases, the required escapeways must begin at
the projected location of the loading point in areas where equipment is
being installed and at the location of the last loading point for the
section when equipment is being removed. This aspect of the final
rule clarifies the existing provision and is necessary to provide safe escape
for miners from hazards that may develop during this phase of the mining
operation.
57 Fed. Reg. at 20,904 (emphasis added).
The
meaning of words, especially those deemed to be ambiguous, is derived from
context. See Deal v. United States, 508 U.S. 129, 132 (1993)
(fundamental principle that the meaning of a word cannot be determined in
isolation, but must be drawn from context in which is it used); Shell Oil
Co. v. Iowa Dep’t of Revenue, 488 U.S. 19, 25 n.6 (1988) (“Words are not
pebbles in alien juxtaposition; they have only a communal existence; and not
only does the meaning of each interpenetrate the other, but all in their
aggregate take their purport from the setting in which they are used.”)
(citations omitted). Indeed, like peas in a pod, the phrase “area(s) where
mechanized mining equipment is being installed or removed” nearly always
finds itself positioned immediately next to “working section” (see 30
C.F.R. §§ 75.313(a)(3); 75.325(g); 75.332(a)(1); 75.350(a), (b), (b)(2),
(b)(6), (d); 75.351(b)(1), (c)(4), (c)(7), (f), (n)(3)(iv); 75.352(c)(1);
75.360(b)(3), (c)(1); 75.371(ii); 75.380(b)(1)) or “working place” (see 30
C.F.R. §§ 75.323(b)(1),(2)).[43]
Thus, applying the constructional cannon of noscitur a sociis, that a
word is known by its associates, it is sensible and reasonable to conclude
“area(s) where mechanized mining equipment is being installed or removed” is
closely related to and mirrors the active “working section.”
“Area”
is to be Interpreted Narrowly
Even
if the applicable “area” where mechanized mining equipment is being installed
or removed was not meant to mirror the working section, there is ample evidence
throughout the Federal Register that “area” should nonetheless be read
narrowly.
The discussion of preshift examinations, section 75.360(b), notes “[i]ncluded in this examination of working sections and areas where equipment is being installed or removed are working places and ventilation controls and approaches to worked-out areas on those working sections or in these areas. 57 Fed. Reg. at 20,893–94 (emphasis added). Had MSHA intended the “area” where equipment is being installed or removed to encompass the entirety of the panel, there would be no need to enumerate these last three places. The discussion continues on to state, “[o]ther areas that require a preshift examination are approaches to worked-out areas in active workings and seals along intake entries where intake air passes through or along these entries on its way to a working section.” Id. at 20,894 (emphasis added). Again, if “area” were to encompass the entire panel, there would be no need to describe these “other areas.”
The
same pattern of using the word “area” to delineate a discrete location is
observed throughout the regulations. See, e.g., 30 C.F.R. §§
75.313(b) (mentioning “other areas” where methane is likely to accumulate);
75.313(c)(2) (mentioning “areas or haulageways where methane is not likely to migrate
or accumulate”); 75.313(c)(3) (describing “areas where methane is not likely to
migrate to or accumulate”); 75.351(b)(1), (n)(3)(iv) (noting “other areas
designated in the approved emergency evacuation and firefighting program of
instruction” in addition to working sections and areas where mechanized mining
equipment is being installed or removed); 75.351(e)(1)(iii) (mentioning “areas
along each belt entry”); 75.352(c)(1) (describing “affected areas” during
sensor alerts and alarms); 75.361(b) (describing areas “required to be examined
outby a working section”); 75.384(c)(2) (explaining that miners shall be
withdrawn from “face areas” to “a safe area outby the section loading point”); 75.388(d)
(discussing borehole penetration in an “area that cannot be examined”);
75.388(f) (mentioning an “inaccessible area of another mine”); 75.389
(describing areas penetrated by boreholes).
I
note one clear exception: The phrase “underground area,” which describes a
portion of the mine even larger than the old 2B panel, is used throughout Subpart
D. 30 C.F.R. §§ 75.311(b)(3); 75.312(c), (d); 75.313(d)(1)(i);
75.360(a)(1), (g); 75.364(f)(1), (2); 75.372(b)(9); 75.389(c)(3). However, the
word “area” is modified by the word “underground.” Section 75.380(b)’s “area
where mechanized mining is installed or removed” does not have this expansive
modifier. Thus, the most sensible conclusion is that an “area” where
mechanized mining equipment is being installed or removed is also interpreted
as a discrete location.
The
Secretary has Failed to Provide Evidence to Bolster his Argument
As
discussed above, the language of the Subpart D regulations and preambles does
not support a reading of “area(s) where mechanized mining equipment is being
installed or removed” in the way the Secretary interprets. The Secretary’s
remaining arguments shift the focus to the Respondent: (1) Respondent’s
interpretation is contrary to the safety purposes of the Mine Act and (2)
Respondent’s witnesses are not credible.
The
Secretary twice cites to the Federal Register’s “hazards that may develop
during [the installation or removal] phase of the mining operation” language
for the proposition that equipment removal is a “distinct phase of mining” that
requires an escapeway to protect against all hazards, including pinch-point
hazards, crush-by hazards, and electrical hazards. (Sec’y Br. 16, 26) This
interpretation distracts from the clear and intentional directive of the
ventilation regulations and, more specifically, the escapeway provision. The
danger the escapeway regulation addresses is not any conceivable hazard in a
mine, but the potential of a methane ignition and explosion such as what
happened in the William Station mine disaster, which was the impetus for adding
the subject escapeway requirement during both equipment installation and
removal. (Tr.217:7–221:25; see 57 Fed. Reg. at 20,894) The relevant
danger is the one that arises from changing airflow too soon when a production
unit is being decommissioned. If the face airflow is decreased too soon,
methane that would otherwise have been evacuated, as during normal production,
is allowed to build up. Thus, while the Secretary’s general, catch-all
justification of “in the interest of miner safety” (Sec’y Br. 25) is
ever-present and ever-important in Mine Act cases, the Secretary fails to
properly acknowledge the specific safety-purposes of escapeways.
With
this purpose in mind, the
Secretary’s contention that Respondent’s interpretation “imposes an arbitrary
line as the difference between safety and danger” (Sec’y Br. 17) is less
convincing. Eslinger, Reynolds,
and Barras all testified about the extremely hazardous conditions — especially
during the loading of coal — that exist inby the loading point, including
unsupported roof and higher levels of methane. (Tr.196:4–11; 248:21–10; 250:12–251:1;
276:9–15) Indeed, the 1992 preamble discussion of methane supports
Respondent’s witnesses’ statements and logic. See, e.g., 57 Fed. Reg.
at 20,875 (“Areas where coal is being extracted or mechanized mining equipment
is being installed or removed are typically the places in any underground mine where
methane accumulation and other hazards to health or safety can develop quickly
when ventilation is interrupted.”). There is also direct support in the
regulations that the loading point is not an “arbitrary” line of safety. In
section 75.384(c), Longwall and Shortwall Travelways, the regulation states:
“[w]hen a roof fall or other blockage occurs that prevents travel in the
travelway — [. . .] (2) Miners shall be withdrawn from face areas to a safe
area outby the section loading point.” 30 C.F.R. § 75.384(c)(2) (emphasis
added); see also 57 Fed. Reg. at 20,908. The preamble in the 1992
Federal Register additionally supports that the loading point is an important
place marker: “[t]o avoid exposure of miners to [methane accumulation and other
hazards that develop quickly when ventilation is interrupted], timely
withdrawal of persons is an important safety practice. Requiring withdrawal
from the working section means that miners must be withdrawn out by [sic]
the section loading point.” 57 Fed. Reg. at 20,875 (emphasis added).
Moving equipment outby the loading point, while not totally free from all
potential hazards, moves it into an area substantially less hazardous for
methane ignition. (Tr.248:18–249:10) This is not an immaterial consideration.
The Secretary’s argument that the run-of-the-mill
danger associated with moving any equipment from one place to another in a
mine, not the specific danger of methane accumulation and explosions addressed
in this regulation, urges the unconvincing ad hoc interpretation advocated
here, that any moving of any equipment in a mine requires the
establishment of an escapeway. As will be discussed below, see discussion
infra Section VI. B. 2, the absurdity of the Secretary’s interpretation
is evidenced by specific examples of moving mechanized mining equipment on
worked-out panels.
The Secretary
spends the remainder of his argument attempting to discredit Eslinger and
Respondent’s other witnesses. I have already determined above, see discussion
supra Sections IV. B & C, that I could find no legitimate reason to
discredit Respondent’s witnesses. In any event, the Secretary’s preferred
arguments are two-sided blades. For example, the Secretary attempts to
discredit Eslinger by stating that “[d]eference is owed to the decision maker
authorized to speak on behalf of the agency, not to each individual agency
employee.” (Sec’y Br. 23, citing Serono Labs., Inc. v. Shalala, 158
F.3d 1313, 1321 (D.C. Cir. 1998)) It is true that despite having worked
directly on the drafting of the Subpart D regulations over many years, Eslinger
does not speak on behalf of the agency. But, by the same token, no single agency
employee may speak for the agency, including Belford. In the absence
of any additional evidence, it appears the Secretary is basing his
interpretative position on the testimony of a single MSHA inspector with six
years of mining experience who had never seen this type of situation before. As
recently clarified by the Supreme Court, Auer deference can only be
given if the regulatory interpretation is the agency’s “authoritative” or
“official” position and must “at the least emanate from [agency heads], using
those vehicles, understood to make authoritative policy in the relevant context.”
Kisor, 588 U.S. at ___ (slip op. at 16). Belford and his direct
superiors do not qualify.
The
Secretary also argues that Respondent can point to no PPM or Question and
Answer (Q&A) documents to support its interpretation. (Sec’y Br. 24)
Again, this cuts both ways. The Secretary is the party uniquely responsible
for issuing PPMs and Q&A documents, but he is similarly unable to point to
any interpretative documentation to support his position. It is the Secretary,
not the Respondent, who bears the burden of establishing the factors necessary
to afford his position deference. See Peabody Twentymile, 39
FMSHRC at 1332, argued, No. 17-9540 (10th Cir. Mar. 22, 2018).
The
Secretary’s History of Interpretation and Enforcement is Unclear
Although
not explicit in the Secretary’s post-hearing brief, the Secretary implies in
his reply brief that his interpretation of the escapeway regulation has been
consistently held and enforced. (See, e.g., Sec’y Reply Br. 5 (“Respondent’s
argument missed the mark because it mistakenly presumes the Secretary has
changed [his] position [. . .] the Secretary is not taking a new
position but instead merely opposing Respondent’s misconstruing of a clear
regulation.”)) (emphasis added) However, there is no evidence in the record
that the Secretary’s current view has been long-held. The Secretary’s sole
witness, Inspector Belford, said nothing about this point. Belford said
nothing about this being a long-held belief in the District 8 office, let alone
across all MSHA offices. Belford did state on cross examination, however, that
he was never trained on what “removal,” and by logical extension, the
applicable “area,” meant. (Tr.90:13–15)
The Secretary
explicitly states that MSHA had never officially adopted Respondent’s and
Eslinger’s interpretation of the escapeway provision. (Sec’y Reply Br. 3, 5–6)
Nevertheless, he
allows that even if Eslinger’s interpretation was advanced when Subpart D was
first promulgated, an inconsistent enforcement pattern does not estop MSHA from
proceeding under the interpretation it concludes is correct. (Sec’y Br. 23, citing
U.S. Steel Mining Co., 15 FMSHRC 1541, 1547 (Aug. 1993)) That he did not
provide evidence of enforcement against Respondent’s practices is, in the
Secretary’s words, “of no consequence.” (Sec’y Reply Br. 6) It is certainly
possible that Respondent’s witnesses, with decades of combined mining
experience in District 8, (and, by extension, their various operator employers)
misunderstood and were in violation of the escapeway provision for 24 years.
It is also possible they managed to evade reprimand or citation despite
practicing mechanized mining equipment removal based on this purported
misunderstanding. That these operators seem to have done so openly in plain
sight does not make this a statistical impossibility either. However, as
stated by the Supreme Court, “where, as here, an agency’s announcement of its
interpretation is preceded by a very lengthy period of conspicuous inaction,
the potential for unfair surprise is acute.” Christopher, 567 U.S. at
158. Quoting the sagacious Judge Posner of the Seventh Circuit, the Supreme
Court further noted that “while it may be ‘possible for an entire industry to
be in violation of the [FLSA] for a long time without the Labor Department
noticing,’ the ‘more plausible hypothesis’ is that the Department did not think
the industry’s practice was unlawful.” Id. (quoting Dong Yi v.
Sterling Collision Ctrs., Inc., 480 F.3d 505, 510–11 (7th Cir. 2007)).
Such appears to be the case here.[44]
Alternative
arguments are acceptable in most cases. But when the Secretary — after having provided
virtually no evidence — claims the agency has been consistent in its
interpretation for years, and then argues that the agency may change his views
without notice, without consistent enforcement, and without evidence to support
the argument, the Secretary’s interpretation cannot be deemed to be fair,
considered, or even reliable.
The Secretary has adduced insufficient
evidence to show that his interpretation is reasonable or reflects
the agency’s fair and considered judgment; to the contrary, the
evidence demonstrates that the Secretary’s position
is unreasonable and merely the ad hoc interpretation of
a single inspector and his supervisors. This logical lacuna in the
Secretary’s interpretation is evident when I apply the Secretary’s
interpretation to section 75.380(b) and even more so when I apply it to the
other regulations in Subpart D.
2. The
Secretary’s Interpretation of Section 75.380(b) Yields Inconsistent Outcomes
and Leaves Logical Gaps
The
Secretary cites repeatedly to the fact that moving mechanized mining equipment
can create hazards, for example pinch-point hazards, crush-by hazards,
electrical hazards, and fire hazards. (Sec’y Br. 16, 26) The Secretary
correctly points to the fact that not all hazards are eliminated once equipment
is moved past the former loading point. (Id. at 16, 18, 25) For these
reasons, the Secretary argues mechanized mining equipment had to be moved off
the old 2b panel in order to be properly “removed.” However, there are serious
inconsistencies and logical gaps if the Secretary’s interpretation is adopted.
Let’s
suppose Respondent moved CM234, CM235, and FB605 off the old 2B panel — an
additional 8,600 feet from the former loading point. According to the
Secretary’s interpretation, this would have constituted proper “removal” of the
mechanized mining equipment. Let’s suppose Respondent then dismantled the
lifeline, powered off the two-way communication at the refuge alternative, shut
down tracking, and completed the air change. The old 2B panel would no longer
be in active working status. Now let’s suppose Respondent then immediately
moved the three pieces of equipment back onto the old 2B panel and
parked them in crosscuts 125, 126, and 127 — the precise locations
Inspector Belford found them in on September 6, 2016. It appears this would
not be a violation. It is not readily apparent to me how this (non-violative)
situation is any safer than what Respondent actually did. In both cases, the
three pieces of mining equipment ultimately ended up in crosscuts 125, 126, and
127. Yet, the Secretary claims one fact pattern is dangerous insofar as it
requires the protections of an escapeway; the other — where mining equipment
was moved an additional 17,000 feet — would not. To accept this outcome would
exalt form over substance. This inconsistent outcome cannot be what MSHA
envisioned.
Similarly,
the Secretary largely avoided addressing the Respondent’s legitimate
counterargument that escapeways are not required every time mechanized mining
equipment is being moved or transported in a mine. Respondent’s witnesses and
Inspector Belford testified that escapeways are not required when mechanized
mining equipment is moved back into a worked-out, inactive portion to make
repairs. (Tr.97:5–98:19; 162:2–19; 202:14–203:21; 280:24–283:12) For example,
mechanized mining equipment might be moved into a return air course to do
cleaning or roof bolting. (Tr.204:7–17; 281:6–25; 282:1–9; 283:3–12) No
escapeway would be required in this situation. (Tr.204:18–20; 282:10–12)
Additionally, although unusual, it is not unheard of to use a continuous miner
for cleanup work. (Tr.203:22–204:3; 282:13–283:2; contra Tr.103:12–20)
No escapeway would be required in this situation either. (Tr.204:4–6; 282:21–23)
All of the hazards that would exist in moving CM234, CM235, and FB605 from
crosscuts 125, 126, and 127 off the panel would exist in these
cleaning/maintenance scenarios.
The
Secretary’s response to this compelling counterargument can be found hidden in
a single footnote.[45]
The Secretary states that the regulations contemplate protection during
equipment removal associated with the end of a production section as a distinct
phase of mining; thus, Respondent’s counterexamples are not related to the
phase of mining contemplated by the regulations. (Sec’y Br. 26 n.10) The
Secretary’s argument conflates the “distinct phase of mining” the preambles
warn about, i.e., the decommissioning of equipment that is occurring at the
former working section inby the loading point, with the transportation of
mechanized mining equipment outby the loading point. This side-step by the
Secretary leads to a distinction without a difference. To accept the Secretary’s
argument here would once again place form over substance.
It
makes logical, practical sense that escapeways and their related requirements
are not required in every scenario when mechanized mining equipment is being
moved. As Kimbel and Barras both testified, mines have a limited amount of
air. (Tr.111:5–8; 276:6–7) Working sections are prioritized since dangerous
levels of methane and dust exist at the working faces and need to be diluted.
(Tr.111:7–17; 276:12–15) Worked-out locations, by contrast, do not require as
much air to maintain safe conditions. (Tr.111:7–17; 276:1–7) If every
maintenance situation in old, worked-out panels that involved mechanized mining
equipment required escapeways to be installed — along with air changes — it
could compromise the mine’s ability to maximize its ventilation resources for
the safety of miners in active areas. Consistent with this logic and history,
Peabody planned for the unit 2 move by doing an engineering review to determine
what changes were needed to redirect the ventilation airflow away from what had
been an active mining unit in the old 2B panel so that the available airflow
could be sent to higher priority areas of the mine. (Tr.168:3–11; 274:5–276:7)
The
Secretary’s argument — conceived for purposes of this litigation — is so narrow
that it leads to an absurd result. The absurdity arises from an awareness of
the need during normal mining operations to move mining equipment from one
place to another in inactive, worked-out panels without having to attend to the
escapeway requirement. The Secretary has provided no rational explanation to
account for the inconsistent outcomes that emerge from his interpretation of
the escapeway regulation.
3. The
Secretary’s Interpretation Leads to Absurd Results when it is Applied to Other
Regulations in Subpart D
As discussed
numerous times above, the Secretary argues that the applicable “area” that
mechanized mining equipment must be removed from was the old 2B panel. As
shown below, applying the Secretary’s interpretation to related regulations in
Subpart D leads to absurd results.[46]
Section
75.313(a), which involves procedures when there is a main mine fan stoppage
while persons are underground, states:
If a main mine fan stops while anyone is underground and the ventilating quantity provided by the fan is not maintained by a back-up fan system — [. . .] (3) Everyone shall be withdrawn from the working sections and areas where mechanized mining equipment is being installed or removed.
30
C.F.R. § 75.313(a) (emphasis added). Substituting in the Secretary’s
interpretation for the subject area during removal, we can understand the
regulation to read, “if a main mine fan stops while anyone is underground and
the ventilating quantity provided by the fan is not maintained by a back-up fan
system — [. . .] Everyone shall be withdrawn from the working sections and old
2B panel [during removal].” Thus, miners at the working section must be
withdrawn from the working section — in other words outby the loading point;
miners during the equipment removal phase, which is no more dangerous than the
active mining phase, would instead have to be withdrawn from the panel. In the
case of Wildcat Hills’ old 2B panel, this would account for a difference of
8,600 feet.
Section
75.351(f), which specifies the required locations for atmospheric monitoring
sensors, instructs that in order to monitor the primary escapeway, “carbon
monoxide or smoke sensors must be located in the primary escapeway within 500
feet of the working section and areas where mechanized mining equipment is
being installed or removed. In addition, another sensor must be located
within 500 feet inby the beginning of the panel.” 30 C.F.R. § 75.351(f)
(emphasis added). Rewritten with the Secretary’s interpretation substituted
in, the regulation would mandate that, during removal, sensors be located in
the primary escapeway within 500 feet of the old 2B panel. This would result
in a sensor being placed somewhere in the 2A Sub Main, which is absurd as it
would not properly detect problems near the former working section, where the
risk is greatest. I also note that the regulation mandates an additional
sensor 500 feet inby at the beginning on the panel. Had MSHA intended for the
“area” during equipment installation or removal to also mean “the panel,” they
could/would have said so.
The escapeway maps provision would also be nonsensical if the Secretary’s current interpretation of “area” were adopted.[47] The escapeway map provision states:
(a) Content and accessibility. An escapeway map shall show
the designated escapeways from the working sections or the miners’ work
stations to the surface or the exits at the bottom of the shaft or slope,
refuge alternatives, and SCSR storage locations. The escapeway map shall be
posted or readily accessible for all miners—
(1) In each working section;
(2) In each area where mechanized mining equipment is being installed or removed;
(3) At the refuge alternative; and
(4) At a surface location of the mine where miners congregate,
such as at the mine bulletin board, bathhouse, or waiting room.
30
C.F.R. § 75.1505(a) (emphasis added). Reworded with the
Secretary’s interpretation in mind, the escapeway map provision would read:
“The escapeway map shall be posted or readily accessible for all miners [. . .]
(2) in the old 2B panel [during removal] [. . .] .” If
this were the case, an operator could comply with the regulation by placing an
escapeway map at the former working face, at the beginning of the old 2B panel,
or anywhere in the 8,900 feet between the two. Such a result would be contrary
to common sense and the safety-focused purpose of the regulation as miners
might not be able to reliably check the escapeway map in the event of an
emergency. It is absurd and cannot be what MSHA and its drafters intended.
Section
75.323, which involves procedures when methane levels are excessive, instructs
that various tests for methane concentrations be made at least 12 inches from
the roof, face, ribs, and floor. 30 C.F.R. § 75.323(a). Subsections (b) and
(c) describe the procedures when methane reaches 1.0% and 1.5%, respectively,
in “a working place or an intake air course [. . .] or in an area where
mechanized mining equipment is being installed or removed [. . .] .” 30 C.F.R.
§§ 75.323(b)(1), (2). Substituting in the Secretary’s interpretation for
the subject area during removal would mean that methane measurements could be
taken practically anywhere in the old 2b panel rather than discrete areas
notorious for methane accumulations. The results of this could be
catastrophic.
Section
75.332(a)(1), which involves working sections and working places, requires that
“[e]ach working section and each area where mechanized mining equipment is
being installed or removed” be ventilated by a separate split of intake air
directed by overcasts, undercasts, or other permanent ventilation controls.”
30 C.F.R. § 75.332(a)(1). Substituting in the Secretary’s interpretation, the
regulation would require that, during removal, the entire old 2B panel would
need to be ventilated by a separate split of intake air directed by overcasts,
undercasts, or other permanent ventilation controls. The infeasibility of this
undertaking exposes the absurdity of the Secretary’s position.
I cannot credit the Secretary’s rationale for his
interpretation. In contrast, Respondent’s view is more defensible, coherent,
and supplemented with credible testimony regarding the historical application
of enforcement. As the Secretary’s interpretation of the escapeway standard is
unreasonable, not fairly considered, and results in absurd outcomes, deference
to the Secretary is not appropriate.
VII. PARTIAL SETTLEMENT FOR CITATION NO.
9038387
On April 9, 2018, and prior to the hearing, the Secretary filed a motion to approve partial settlement. a reduction in the penalty for Citation No. 9038387 from $918.00 to $213.00 was proposed.
The Secretary also requested that Citation No. 9038387 be modified to reduce the gravity from “Reasonably Likely” to “Unlikely” and to remove the “S&S” designation. In support of this, Respondent would have presented evidence at hearing to show the cable at issue was a shielded cable and power conductors are individually shielded. If cable damage were serious enough to cut internal conductors, Respondent argued the most likely scenario would be a ground fault. Ground fault currents are limited by the grounding resistor. If a phase-to-phase short circuit occurred, the system was designed such that the minimum short circuit current available was well in excess of the setting cited. Respondent stated an analysis was conducted using the MSHA short circuit calculation program, and it was determined that the maximum available current was 6,005 amps; the minimum short circuit current available was 4,541 amps. Accordingly, Respondent argued that it was unlikely the breaker would not trip in the event of a short circuit. In consideration of the Respondent’s arguments, the Secretary agreed to reduce the gravity from “Reasonably Likely” to “Unlikely,” to remove the “S&S” designation, and to accept a reduced penalty.
I have considered the representations and documentation submitted in this case for Citation No. 9038387, and I conclude that the proffered partial settlement is appropriate under the criteria set forth in section 110(i) of the Act.
VIII. SUMMARY AND ORDER
The Secretary has failed to prove by a preponderance of the evidence that an escapeway was required in the old travelway on the old 2B panel during Inspector Belford’s E01 inspection on September 6–8, 2016. As the three citations issued on September 8, 2016, were predicated on the existence of an escapeway, they must be vacated.
Accordingly, it is ORDERED that Citation Nos. 9039355, 9039356, and 9039357 are hereby VACATED.
It is further ORDERED that Citation No. 9038387 be MODIFIED to reduce the likelihood from “Reasonably Likely” to “Unlikely” and to remove the “S&S” designation.
It is further ORDERED that the operator pay a penalty of $213.00 within 40 days of this decision and order.[48]
/s/ L. Zane Gill
L. Zane Gill
Administrative Law Judge
Distribution:
R. Jason Patterson, Esq.
Office
of the Solicitor
U.S. Department of Labor
230 S Dearborn St, Ste 844
Chicago, IL 60604–1779
Arthur M. Wolfson, Esq.
Fisher & Phillips LLP
One Oxford Center
301
Grant St, Ste 4300
Pittsburgh, PA 15219–6405
[2] The “old 2B panel” is the area where mining unit No. 2 was previously located. Unit 2 was moved to another location in the mine. (Tr.43:17–44:1)
[3] The findings of fact are based on the record as a whole and my careful observation of the witnesses as they testified. In resolving any conflicts in testimony, I have taken into consideration the interests of the witnesses, all consistencies or inconsistencies in their testimony, and their demeanor. Any failure to analyze each witness’ testimony is not a failure to have fully considered it. The fact that some evidence is not discussed does not mean that it was not considered. See Craig v. Apfel, 212 F.3d 433, 436 (8th Cir. 2000) (administrative law judge is not required to discuss all evidence, and failure to cite specific evidence does not mean it was not considered).
[4] Active workings are “[a]ny place in a coal mine where miners are normally required to work or travel.” 30 C.F.R. § 75.2.
[5] Return air is defined
in 30 C.F.R. § 75.301 as:
Air that has ventilated the last working place on any split of any working section or any worked-out area whether pillared or nonpillared. If air mixes with air that has ventilated the last working place on any split of any working section or any worked-out area, whether pillared or nonpillared, it is considered return air. For the purposes of § 75.507–1, air that has been used to ventilate any working place in a coal producing section or pillared area, or air that has been used to ventilate any working face if such air is directed away from the immediate return is return air. Notwithstanding the definition of intake air, for the purpose of ventilation of structures, areas or installations that are required by this subpart D to be ventilated to return air courses, and for ventilation of seals, other air courses may be designated as return air courses by the operator only when the air in these air courses will not be used to ventilate working places or other locations, structures, installations or areas required to be ventilated with intake air.
[6] A primary escapeway has to be ventilated with intake (fresh) air, and it has to go all the way to each section. 30 C.F.R. § 75.380(f). It cannot be used for any other purpose. (Tr.273:5–14) A secondary (alternate) escapeway is less restricted; it can be common with belt or travel road air. (Tr.274:5–15; 30 C.F.R. § 75.380(h))
[7] A worked-out area is “[a]n area where mining has been completed, whether pillared or nonpillared, excluding developing entries, return air courses, and intake air courses.” 30 C.F.R. § 75.301.
[8] Kimbel is the Manager of Engineering at the Wildcat Hills Mine in the Arclar Complex. (Tr.107:15–108:6) He is a professional engineer with a Master of Science degree and has 11 years of experience in the mining industry. (Tr.108:25–109:11)
[9] Reynolds is a project manager for Peabody. (Tr.165:13–18) In August of 2016, he was the underground superintendent and general mine manager. (Tr.165:25–166:7) He has 43 years of mining experience at various underground mines in the region. (Tr.166:15–167:15) Any unit move would be under Reynolds’ supervision. (Tr.167:16–168:2)
[10]
Barras is (and was) the safety and compliance director for Peabody Energy. (Tr.258:24–259:9;
260:22–25) Barras was a ventilation engineer at MSHA prior to working for
Peabody. (Tr.261:3–7) Mark Eslinger was his supervisor at MSHA. (Tr.261:10–12)
[11] Reynolds could
not recall, however, if all of the essential equipment was moved before
the air change. (Tr.187:13–189:4)
[12] The last former loading point was located at crosscut 130. (Ex. J–3) While there is no dispute that the three pieces of mechanized mining equipment were outby the former loading point (Tr.90:18–23; 99:3–7), there is a slight discrepancy in the record about precisely where they were parked. During the hearing, Inspector Belford illustrated on Joint Exhibit 3 that F605 was located in crosscut 129 and the continuous miners were located in crosscuts 128 and 127. (Tr.50:8–19; Ex. J–3) Douglas Combs’ map shows F605 located in crosscut 127 and the continuous miners located in crosscuts 125 and 126. (Tr.147:6–10; 148:4–6; Ex. R–6) This discrepancy does not alter my analysis. Thus, I will refer to Inspector Belford’s locations.
[13] Belford received a bachelor’s degree in mining engineering in 2010. (Tr.29:2–16) After graduation, Belford spent one year in the private sector as a full-time production management trainee. (Tr.30:1–4) In 2011, Belford began working at MSHA as a coal mine inspector. (Tr.31:5–10)
[14] Combs was the safety supervisor at Wildcat Hills. (Tr.135:24–136:3) Combs’ responsibilities included working on policies and procedures and escorting federal and state inspectors. (Tr.136:6–9)
[17] The old 2B left return and old 2B travelway are adjacent to each other and connected by a man door. (Tr.139:12–17)
[18] There is a
discrepancy in the record whether Combs was also present at the tracking office
for this discussion. (Tr.54:3–8; contra Tr.142:16–143:4)
[19] Barras believed
that the lifelines were pulled out of the old 2B panel on September 7 to avoid
the appearance they were connected to functioning refuge alternatives. (Tr.307:21–308:8)
[20] Combs, on the other hand, recalled Belford saying that Wildcat Hills would either get two or three serious citations or none at all. (Tr.144:21–145:1)
[21] Although manual tracking can vary from mine to mine, here, miners were instructed to call out and somebody would write in a record book the names of the miners going into the old 2B panel. (Tr.59:12–14; 101:24–102:2)
[22] Barras explained that Wildcat Hills’ Emergency Response Plan requires two forms of tracking in escapeways. (Tr.308:16–310:3) His belief was that the old 2B travelway was not an escapeway by that time.
[23] Combs also
recalled participating in a conversation about tracking, communications, and
the lifelines in the old 2B panel with Reynolds, Max Hainey (Safety Manager),
and Inspector Belford. (Tr.148:14–149:7) At this point, Combs believed that
nobody, including Inspector Belford, had a clear notion whether the old 2B
travelway was still an escapeway. (Tr.150:3–13) It is not clear from the
record whether the meeting Belford recalled is the same as the one Combs
recalled.
[24] Belford
testified that he was sure he met separately with Barras and Reynolds (Tr.60:18–19),
but he was unsure if he also spoke with Barras and Reynolds together at the
same time. (Tr.316:4–10) Barras recalled that Reynolds was present.
(Tr.290:3–8) Barras could not remember the exact date but remembered the
substance of this meeting vividly because Belford accused Barras of not caring
about the safety of his men, which was upsetting to him. (Tr.290:3–18)
[25] Reynolds testified that he came up on Combs, Barras, and Belford talking. (Tr.182:6–9) Reynolds recalled Belford saying that it would be okay if the mine just hooked the lifelines back together. (Tr.182:10–11) Reynolds recalled Barras saying that would not fix the issue because the primary and secondary escapeways were now common. (Tr.182:12–16) Barras also recalled this exchange with Belford. (Tr.290:21–291:14) Inspector Belford, however, denied ever telling Barras that the mine could just put the lifelines together. (Tr.316:16–21)
[26] Belford had never received any training from MSHA about what constitutes removal of equipment for purposes of the escapeway requirement. (Tr.90:8–15) Belford had never encountered a situation like this (Tr.88:9–13), so it is not surprising that he had not been trained to this interpretation of the regulation. (Tr.88:2–89:18)
[27] In order to terminate the citation, the lifeline had to be re-established but was moved from the travelway to the left return entry. (Tr.79:10–23) Belford testified that this was because the travelway (where the lifeline had originally been located) was now ventilated with the same air as the primary escapeway after a few brattices were knocked down during the air change on August 27, 2016. (Tr.79:24–80:10; 317:10–19)
[28] The Secretary moved in limine to exclude Eslinger’s testimony. The motion was denied, and Eslinger was allowed to testify. (Tr.11:7–12:22)
[29] Eslinger also
participated in the subsequent 1996 rewrite, which did not involve a change to
the escapeway regulation’s paragraphs (b)(1) and (b)(2) that are at issue here.
(Tr.210:19–23; 61 Fed. Reg. 9764-01, 9810 (Mar. 11, 1996). In 2004, he was
also on the committee that drafted and issued a new belt air rule that
permitted the use of belt air on working sections. (Tr.210:23–211:8)
[30] Gas Explosion in Kentucky Leaves 10 Coal Miners Dead, N.Y. Times (Sept. 14, 1989), https://www.nytimes.com/1989/09/14/us/gas-explosion-in-kentucky-leaves-10-coal-miners-dead.html
[31] The Pyro mine disaster took place at a longwall panel, Longwall Panel O. (Tr.217:25–218:2) Unlike a continuous miner unit, longwall recovery and removal involves much more work, including disassembling and moving hundreds of shields, a double arm sheer, the stage loader, the chain conveyor, and the pan line. (Tr.218:16–219:5; 230:12–232:9) This process can take weeks. (Tr.219:4–6)
[32] The pan line is in sections and connected by “dog bone connectors,” which are connected by screws. (Tr.219:12–17) During the mining process, the screws rust. (Tr.219:17–19; 232:3–7) The easiest way to remove the rusted screws is to cut them out with an acetylene torch. (Tr.219:19–220:10; 232:7–9)
[33] The disassembly of equipment precedes the moving of equipment. (Tr.249:19–250:7) Nonetheless, dissembling of equipment is part of “removal.” (Tr.258:1–5)
[34] By contrast, the Secretary’s sole witness, Inspector Belford, had only six years of professional mining experience, had not been specifically trained on what constituted “removal,” and had never seen this application of facts to the regulation.
[35] Upon seeing CM234, CM235, and FB605 stored in the crosscuts outby the loading point, Belford could have concluded the stored equipment was not needed to operate any of the three working units because the three units were all currently in operation at the time. (Tr.100:13–101:8) Thus, he could have further concluded that the old 2B panel was no longer active and should be considered a worked-out part of the mine.
[36] Area is defined
as “[a] roughly bounded part of the space on a surface; a region.” Area,
The Am. Heritage Dictionary of the English Language 94 (4th ed. 2009); see
also Webster’s Third New Int’l Dictionary 115 (3d ed. 1993) (“a level or
relatively level piece of unoccupied or unused ground; the superficial contents
of any figure; any particular extent of space or surface”).
[37] The centrality
of the concept of “area” in this case is evident by the frequency it appears in
the record and briefs. The word “area” was used by the Secretary 32 times in
his briefs. The Respondent used it 35 times. It appeared in the transcript
176 times.
[38] While the Secretary was very careful to state that equipment was still being removed from the “old 2B panel” in his briefs, Belford repeatedly characterized the removal from an undefined “area” at the hearing. (Tr.36:14–17; 53:10–13; 66:6–8; 71:17–18; 72:4–6; 81:8–9, 17–18; 103:1–2)
[39] Curiously, the 1988 Federal Register discusses disallowing “permanent electrical equipment or diesel equipment outby working panels” in at least one intake escapeway from each working section in the draft escapeway regulation preamble and draft 75.380 language. 53 Fed. Reg. at 2,408, 2,423 (emphasis added). However, this language was dropped in the 1992 final rule. See 57 Fed. Reg. at 20,904–06, 20,926–27.
[40] As a direct example, the escapeway regulation found in the 1988 draft proposal read as follows:
§ 75.380 Escapeways.
(a) Except in situations addressed by §§ 75.384 and 75.385, at least two separate and distinct travelable passageways shall be designated as escapeways and shall be:
(1) Provided from each working section continuous to the surface or to escape shaft or slope facilities to the surface;
(2) Maintained
in a safe condition to ensure passage at all times of any person, including
disabled persons [. . .] .
53
Fed. Reg. at 2,422. The
phrase “area where mechanized mining equipment is being installed or removed”
is nowhere to be found.
[41] Although this phrase is used in different regulations throughout Subpart D, an important canon of statutory and regulatory interpretation is that a word or phrase is presumed to be used consistently and bear the same meaning throughout a text. See U.S. v. Castleman, 572 U.S. 157, 174 (2014) (Scalia, J., concurring); see also Antonin Scalia & Bryan A. Gardner, Reading Law: The Interpretation of Legal Texts 167 (2012).
[42] Admittedly, “[a]gency regulations can sometimes make the eyes glaze over.” Kisor, 588 U.S. at ___ (slip op. at 14). Combing through regulatory history, while not always exciting, is sometimes necessary to solve these “hard interpretive conundrums [. . .] .” Id.
[43] The few exceptions can be found in section 75.362, On-Shift Examination. 30 C.F.R. § 75.362. Subsection (a)(1) requires an on-shift examination of “each section where anyone is assigned to work during the shift and any area where mechanized mining equipment is being installed or removed during the shift.” 30 C.F.R. § 75.362(a)(1) (emphasis added). Subsection (c)(1) requires an on-shift examination to include a determination of the volume of air “in the last open crosscut of each set of entries or rooms on each section and areas where mechanized mining equipment is being installed or removed, in the intake entry or entries at the intake end of the longwall or shortwall.” 30 C.F.R. § 75.362(c)(1) (emphasis added). Subsection (c)(2) requires a determination of the volume of air “on a longwall or shortwall, including areas where longwall or shortwall equipment is being installed or removed, in the intake entry or entries at the intake end of the longwall or shortwall.” 30 C.F.R. § 75.362(c)(2) (emphasis added). None of these exceptions, however, fortify the Secretary’s argument that “area” where mechanized mining equipment is being installed or removed means an entire panel.
[44] I note that Belford did not issue any citations on September 6 or 7. This is consistent with the notion that neither he nor his supervisors at District 8 were certain about enforcement of the escapeway provision, as the Secretary’s briefs would have me believe. It appears more likely that Belford was not sure whether the old 2B travelway was still an escapeway, which is consistent with the testimony that neither Belford nor Combs was sure on September 6 when they looked at the regulatory language for 75.380(b). It is also consistent with Belford’s testimony that he had never been trained specifically on the meaning of “removal” nor had he ever seen this type of situation before.
[45] The Secretary’s decision to address one of Respondent’s most compelling arguments in a footnote was ill advised. See CTS Corp. v. EPA, 759 F.3d 52, 64 (D.C. Cir. 2014) (“A footnote is no place to make a substantive legal argument on appeal; hiding an argument there and then articulating it in only a conclusory fashion results in forfeiture.”); see also Hutchins v. District of Columbia, 188 F.3d 531, 539 n.3 (D.C. Cir. 1999) (a court “need not consider cursory arguments made only in a footnote”).
[46] I anticipate the Secretary might protest that “area where mechanized mining equipment is being installed or removed” means the old 2B panel in the escapeway provision but, in other ventilation provisions, it means something else entirely. Justice William O. Douglas cautioned of such fickle judgment in Zschernig v. Miller when he cited to Humpty Dumpty’s pronouncement to Alice in Through the Looking-Glass: “When I use a word [. . .], it means just what I choose it to mean — neither more nor less.” 389 U.S. 429, 435 n.6 (1968).
[47] For the 1992 final rule, the escapeway maps regulation was moved to section 75.383. 57 Fed. Reg. at 20,907. On December 8, 2006, section 75.383 was split up and removed: the old subsection (a) was transferred to create a new section, section 75.1505. 71 Fed. Reg. 71,430-01, 71,437 (Dec. 8, 2006). The section was amended in 2008. 73 Fed. Reg. 80,656-01, 80,698 (Dec. 31, 2008). The new section 75.1505(a) shares the same general meaning as the old section 75.383, but it is worded slightly differently and adds a few additional requirements. Compare 30 C.F.R. § 75.383 (1992) with 30 C.F.R. § 75.1505(a) (2008).